Bshaer El-Kheir (1) – Gheit El-Enab – ALEXANDRIA – EGYPT
Scope:
Construction of 20 resident blocks on Turn Key. Main contractor: Bafyconstructions
Saudi Water Authority
Scope:
for a seawater intake and discharge system for a desalination plant in Jazan city –kingdom of Saudi Arabia , the project is one of saline water conversion corporation with the kingdom vision 2030 , the desalination plant capacity is 124,800 m³/day, in our conceptual design we depends on sustainability and ensure environmental protection, hydraulic efficiency, and structural safety while complying with Saudi regulations.
Saudi Water Authority
Scope:
for a Dry Well Pump Station with Wet Well Interface (Selected) - Pipeline discharges into a wet well below ground - Dry-mounted pumps draw water from wet well via suction pipe we depends on sustainability and ensure environmental protection, hydraulic efficiency, and structural safety while complying with Saudi regulations. Some of our human
EDEN VILLAS – CAIRO GATE – 6TH OF OCTOBER – EGYPT
Scope:
Construction works for 107 villas in Cairo Gate Compound on Core & Shell basis. Main contractor: concrete plus
Jefaira North Coast – Ras El Hekma
Scope:
Design Jefaira RO Plant Marine Intake and Outfall Systems ,and operate a reliable, energy-efficient, and environmentally compliant seawater conveyance system that supports the plant's desalination operations safely and continuously throughout its design life. In AHMED NASSAR DESIGNS &KAYAK we always work on a designs depending on sustainability and innovating new ideas with new technologies
MARINE PROJECTS
Marina Matrouh seawater desalination project
Scope:
Design of Intake and Outfall Pipeline. HDPE welding and testing of 3800 meters of 2400mm OD for the intake pipeline and 3800 meters of 1800mm OD pipe for the outfall pipeline. Supply and installation of concrete ballast blocks. Offshore and onshore dredging and back filling the pipeline trench.
Shore Protection Works For Villas Island Project of New Alamin
Scope:
Construct 4 Mazarine Islands for the development of Alamin's city through the dredging and excavation of 475,000 cubic meters of a waterway.
The desalination plant project in Dabaa
Scope:
Installation of a 1200mm HDPE intake line for a desalination plant. Union Dredgers and Marine Contracting has reached a critical milestone for the installation of a 1200mm HDPE intake line in Dabaa, North Egypt. This project includes HDPE Welding, dredging and excavation onshore and offshore utilizing Union Dredgers dredging pontoon with a 10 inch dredging pump and the DOP pump to clear the trench and connect the pipe to the existing flange connection.
Renovation of marine quay – Abokeer Port
Scope:
Mobilization (30 days), Wire cutting (30 days) using 3 electric wire saw machines for about 90 concrete blocks (1×5.5×10 m each), and Demobilization (30 days). Deliverables include concrete drawings.